Due to logistics, inventory and staffing issues, we are experiencing longer than normal wait times. Our current processing times are running 2-5 business days.
This jumper is utilized to bring power from one panel to another in a straight line connection. If a panel gap (i.e. 3 or 4 way connection, then a Panel Gap Extender is required.